Biomass Plant Completed for Texas Coop

Gemma Power Systems, LLC has completed construction of a 49.9 MW biomass plant in Woodville, TX for East Texas Electric Cooperative (ETEC) Woodville Renewable Power Project. The biomass plant, which features a Shin Nippon steam turbine generator and a Riley Power advanced stoker boiler with integrated air quality control system, has completed testing and been turned over to ETEC for commercial operation. Click here to read more on this story.

Back to top