Winter Storm Elliot Settlement Leaves Complaint by Old Dominion Electric Cooperative Claim and East Kentucky Power Cooperative Rights Outstanding

PJM Interconnection settled disputes with 80 parties over $1.8 billion in Winter Storm Elliot non-performance claims. The settlement leaves the complaint by Old Dominion Electric Cooperative, and the rights to bring a claim by East Kentucky Electric Cooperative unresolved.

Back to top